THE FOLLOWING PARTS ARE INCLUDED IN THE PRICE:
Architecture
Constructions
Technical control in the Building Constructions section
Heating, Ventilation and Air Conditioning / HVAC
Water Supply and Sewerage /Water Supply and Sewerage/
Electrical installations /EL/
Energy efficiency/EE/
*The price is excluding VAT. All parts of the project are designed by licensed designers, possessing full design qualifications, members of the Chamber of Architects in Bulgaria and the Chamber of Engineers in Investment Design.
WHAT IS NOT INCLUDED IN THE PROJECT PRICE:
Geodetic photo and vertical plan
Conformity assessment report for the part "Energy efficiency"
Landscaping project
External links* to the project under the Water and Sewerage section
External links* to the project under the Electrical Installations section
Safety and Health Project /SHP/
Fire safety project
Author supervision on part of architecture
Author's supervision of part of the structures /mandatory - carried out by the designer during construction - under a separate contract/
Geological and hydrological field surveys
Construction waste management project /CWMP/: mandatory for houses over 300 sq.m.